Wednesday, September 12, 2012
Wednesday, July 4, 2012
New Listing in the Admaston!
NEW AMAZING LISTING IN THE ADMASTON!!
Rare opportunity to own the largest apartment at the ADMASTON! This is the combination of 12A and 12B, for a magnificent 3500 sqft, the layout could be very flexible since the apartments have not been put together.
For more details please check the listing at: http://taxi.corcoran.com/taxi_reports/Default.aspx?cmaid=2461651&id=20494434
Thursday, May 17, 2012
Pre-War Perfection!
Pre-War Perfection
Wednesday, May 2, 2012
THE ROOF
The old roof was stripped down to the quarry tiles and a new roof was installed.
Parapet covers of copper were installed.
An area was set aside as a roof garden. Paving stones were laid down and a tall iron fence was installed to outline the garden.
A gardening company was retained to design and maintain the roof garden with shrubs and seasonal plantings. An automatic watering system keeps everything green.
The roof garden is furnished with tables, umbrellas and disposable plastic furniture.
The plastic furniture is cheaper and easier to maintain than more traditional heavy wood or metal furniture.
The two water tanks are refurbished, repaired and cleaned on a regular basis.
The old roof was stripped down to the quarry tiles and a new roof was installed.
Parapet covers of copper were installed.
An area was set aside as a roof garden. Paving stones were laid down and a tall iron fence was installed to outline the garden.
A gardening company was retained to design and maintain the roof garden with shrubs and seasonal plantings. An automatic watering system keeps everything green.
The roof garden is furnished with tables, umbrellas and disposable plastic furniture.
The plastic furniture is cheaper and easier to maintain than more traditional heavy wood or metal furniture.
The two water tanks are refurbished, repaired and cleaned on a regular basis.
Monday, April 30, 2012
DECORATING
The floor in
the outer lobby was replaced with green marble.
The cabinetry
and the Concierge desk was constructed of mahogany.
The lobby was
renovated with new mail boxes, mahogany cabinetry, new light fixtures and new
radiator covers with brass grill work.
The radiator covers and counter tops are constructed of green marble to
match the floor in the outer lobby.
An Oriental
carpet was purchased for the lobby.
Four Queen Anne
wing chairs were purchased for the lobby.
An electric
heater was installed over the main entrance to increase heat to the outer
lobby.
The passenger
elevator and the service elevator were completely replaced – motors, cabs,
cables -- everything.
The interior of
the service elevator was refinished in textured stainless steel with a commercial
tile floor. When not in use for
building maintenance, the service elevator doubles as a second passenger
elevator.
The interior of
the passenger elevator was refinished in wood paneling. The floor is green marble to match the
green marble in the lobbies.
The iron
grillwork at the entrance is original to the building.
The floor of
the main lobby is constructed of marble tile and is original to the
building.
The hall floors
are constructed of ceramic tile and are original to the building.
The huge
mirrors across the back of the lobby are original to the building.
The large
marble console table in the lobby is original to the building.
The lobby floor
and the hall floors are given a periodic buffing with a special machine to
shine and preserve them.
The missing
decorative pipe on the two stone areas outside the building was replaced.
A pair of brass
luggage carts are available for the convenience of residents.
Brass
numbers have been installed on the apartment doors.
Tuesday, April 17, 2012
Did you know the Admaston is over 100 years old? Read the article about our facade here:
THE FAÇADE
The entire façade was steam cleaned and new pointing done.
Every five years in accordance with the New York City Local Law 11, the façade is checked periodically for deterioration.
Any structural or cosmetic damage is corrected at the beginning of the five year cycle rather than at the end.
Over the years we have replaced pointing, terra cotta decorations (using a new process that uses a mixture of fiberglass and concrete that is created in molds made from the actual pieces of terra cotta. This process is more impervious to wear than the original terra cotta.) During our last façade work some 250 pieces of terra cotta were replaced.All regular windows were replaced by new double glazed windows with metal frames.
In the halls, the new stained glass windows with metal frames that are exact copies of the originals.
The stained glass skylights in the lobby and the outer lobby are original to the building.
Subscribe to:
Posts (Atom)












